The Drilling Process

The drilling process begins with pad site construction, which typically lasts approximately one to four weeks, depending on the location. Next, the set up of the rig and the drilling of the well will take approximately three to four weeks per well. During this time, operations usually run continuously 24 hours a day, seven days a week. Multiple wells are sometimes drilled from a single padsite. Although the rig is the most visible part of drilling operations, it is temporary and will be removed once drilling is completed. Once the layer of rock that holds the natural gas is reached, the well will be completed and prepped for production.

As with any construction site, there will be additional truck traffic for the setting up and taking down of the equipment. There can be noise, dust and traffic. After the wells are completed, the company regularly returns to monitor and maintain the site. At some well sites, trucks may return to remove water produced by the gas well, which is separated from natural gas during the gathering process and stored in tanks located on the site. A typical drilling pad site is three to five acres in size.

Site Search

The information contained in this website is provided to you “AS IS”, does not constitute legal advice, and we are not acting as your attorney. We make no claims, promises or guarantees about the accuracy, completeness, or adequacy of the information contained in or linked to this web site and its associated sites.  This information has been assembled from many different sources and is not endorsed by the Board of Garrett County Commissioners.